PRTR Reporting Time Frame. PRTR 报告的时间框架
There are 8 sections in PRTR including; PRTR中包括8个部分;
1) Mill Information 工厂信息
2) Energy and CO2 能源和CO2
3) Water Pollutant 水污染物
4) Air Pollutant 空气污染物
5) Hazardous Waste Transfer 危害废物转移
6) Additional Information 附加信息
7) PRTR – Data Audit PRTR –数据审核
8) Detox (optional) Detox(可选)
To **plete the PRTR form, please prepare the relevant data, report and information.
为填写PRTR表格,请准备相关的数据、报告和信息。
The procedure may be **plicated for your first attempt therefore we have some time allowance for the whole process. Kindly pay attention to the deadline for each action to proceed your ECP application.
第一次填表过程可能比较复杂,因此我们宽限了整个过程的所需的时间。请注意ECP申请的每个步骤的时间节点。
Timeline 时间轴Action 操作Applying ECP/,Online Submission,ECP申请/在线提交Before submitting the ECP self-audit,form in Supplier Exchange, the wet,processing facility MUST,register in IPE platform, download PRTR template and **plete “Mill,Information” and “Water Pollutant” sections. 在向Supplier,Exchange提交 ECP 自我审核表格之前,湿处理工艺设施必须在IPE平台进行登记,下载PRTR模板并填写 “工厂信息”和“水污染物”部分。
The wet processor must upload the PRTR,file which is requested in Minimum Standards: Document Request list in the,online self-audit form. 湿处理工艺设施必须上传最低标准所要求的PRTR文件:自我审核表格中的文件要求列表。
ECP Approval and number released,ECP获准和编号发布M&S will check the documents and review your submission.,玛莎百货将检查和复审你方提交的文件。
The wet processor should now begin kindly prepare data for the remaining sections of the PRTR form; 湿处理加工厂现在应该开始准备PRTR表格中的其余部分的数据;
- Energy,and CO2 能源和CO2
- Air,Pollutant 空气污染物
- Hazardous,Waste Transfer 危害废物转移
- Additional,Information 附加信息
Please note ECP is not approved if
supplier fails to submit relevant documents as requested in self-audit.请注意,如果供应商未能按自我审核中的要求提交相关文件,ECP 将不会得到批准。
Within 2 weeks after ECP approval
在 ECP获批后的 2周内The supplier must,COMPLETE the outstanding sections of the PRTR form;供应商一定要完成 PRTR表格中还未完成的部分;
- Energy and CO2 能源和CO2
- Air pollutant 空气污染物
- Hazardous waste transfer 危害废弃物转移
- Additional Information 附加信息
- PRTR – data audit PRTR –数据审核
(please note, “Detox” section is optional,请注意,“去毒Detox”部分是可选的)
Please,then ensure Wet Processor then submits the information to IPE-PRTR team at,email address PRTR@ipe.org.cn,for review. 请确定湿处理加工厂通过电子邮件将信息提交给IPE-PRTR团队复审,邮箱地址PRTR@ipe.org.cn。
(Please also ensure they also put ECPMarksandSpencer@marks-and-spencer.** on copy 也请确认他们将邮件抄送至ECPMarksandSpencer@marks-and-spencer.**)
This **pleted PRTR data must be
submitted to this IPE email address within 2 weeks after ECP approval. 在ECP获批后的 2周内,一定要将完整的PRTR数据提交到这个 IPE邮箱地址
Within 3 months after ECP approval
在 ECP获批后的 3月内If any follow up action,is required following the IPE desk top audit, then the wet processor must,work with IPE on any corrective actions until they receive IPE approval. 如果在IPE桌面审核中有任何后续需要,湿处理加工厂商必须与配合IPE开展纠正行动,直到他们收到IPE的批准。
IPE approval of the,desk top audit must be concluded within 3 months of ECP approval date. 在 ECP获批的,3月内,,IPE桌面审核的审批必须结束。
After **pletion, supplier must send **pleted PRTR with IPE
approval email to ECPMarksandSpencer@marks-and-spencer.** for record. 审批结束后,供应商必须通过电子邮件把完整的PRTR连同IPE的批复一起发至ECPMarksandSpencer@marks-and-spencer.** 存档。
Remarks: 备注:
IMPORTANT – PLEASE NOTE– 重要—请注意—
If the wet processor does not **plete the PRTR disclosure process in the required time-frame, then the supplier will not be allowed to have their ECP renewed after 18 months. 如果湿处理加工厂没有在规定时间内完成PRTR披露程序,则供应商在18个月后将不被允许对其ECP进行更新。
联系我时,请说是在得易搜分类信息网看到的,谢谢!